Kevin F. McCarthy Hydroelectric Plant Project
- Installation of two hydroelectric water turbines
- Installation of 6 parallel runs of 750kcmil cu.
- Controls System and Hydraulic Power Unit
- Instrumentation and Controls
- HVAC power and control wiring
- Power and Lighting throughout the new metal building
ECCV WSD Well WPA-8R
- Set a VFD
- Installed a Step-up Transformer
- Step Down Transformer from 480V to 208V
- Installed an RTU with a PLC to Control Pumps
- SCADA System
- Instrumentation and Controls
- Installed a Sign Wave Filter
- Wired a 500HP Pump
City of Louisville Sid Copeland Water Treatment
- Upgraded Electrical Gear and Generator to 1600A
- Demoed 800A Switchgear
- Installed 2 PLC Control Panels with a Fiber optic Loop Between Them
- Service Upgrade: Switchover with Two Shutdowns