Kevin F. McCarthy Hydroelectric Plant Project

  • Installation of two hydroelectric water turbines
  • Installation of 6 parallel runs of 750kcmil cu.
  • Controls System and Hydraulic Power Unit
  • Instrumentation and Controls
  • HVAC power and control wiring
  • Power and Lighting throughout the new metal building

ECCV WSD Well WPA-8R

  • Set a VFD
  • Installed a Step-up Transformer
  • Step Down Transformer from 480V to 208V
  • Installed an RTU with a PLC to Control Pumps
  • SCADA System
  • Instrumentation and Controls
  • Installed a Sign Wave Filter
  • Wired a 500HP Pump

City of Louisville Sid Copeland Water Treatment

  • Upgraded Electrical Gear and Generator to 1600A
  • Demoed 800A Switchgear
  • Installed 2 PLC Control Panels with a Fiber optic Loop Between Them
  • Service Upgrade: Switchover with Two Shutdowns